Prefab House Army Camp
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-11-23 13:51
-
Browse the number:
396
+
- Contactaixin:
Contactaixin:
qdlida(Mr.)
- Email: telephone: phone:
-
Area:
Beijing
Address:5th Floor,Building A,Darron Center,No.180,Haier Road,Qingdao, 266000,China
-
Website:
http://www.lidaprefabhouses.com/ http://qdlida.heatherknowles-homeopath.com/
+
Weifang Henglida Steel Structure Co.,Ltd is one of the famous prefab house army camp manufacturers and suppliers China and a professional prefab house army camp factory with low price products made in China, we are able to produce customized, cheap and low cost prefabricated house army camp CE, welcome to wholesale our products and check the price and quotation with us.
Prefab House Army Camp
Prefab house army camp are built with prefab house system, the materials are similar with labor camp totally.
1. Prefab house army Camp Advantages:
(1).Environment protective, no garbage caused
(2).Doors, windows and interior partitions can be flexibly fixed
(3).Beautiful appearance, different colors for the wall and roof.
(4).Cost saving and transportation convenient
(5).Anti-rust and normally more than 15 years using life
(6).Safe and stable, can stand 8 grade earthquake.
2. Prefab house army camp Characteristics:
(1).Wind resistance: Grade 11(wind speed 120km/h)
(2).Earthquake resistance: Grade 7
(3).Live load capacity of roofing: 0.6kn/m2
(4).External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
(5).Second Floor Load Capacity: 150 kg/m2
(6).Live load of corridor is 2.0kn/ m2
(7).Wall permitted loading: 0.6KN/ m2
(8).Ceiling Permitted live loading: 0.5 KN/m2
(9).Wall Coefficient of thermal conductivity: K=0.442W/m2k
(10).Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K
3. Material List for prefab house army camp:
| |
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
4.Finished project photos: